CHECKLIST FOR HIGHRISE BUILDINGS (HRB)
(Last Updated On 10-MAR-2004)
S.NoTender DateYes(Y)/No(N)/Not Applicable(X)
 APPLICATION FORMS
1Whether, APPLICATION FORM - C has been duly filled ?
2Whether, FORM-2(A) Certificate of undertaking of Registered Architect/Engineer has been duly filled ?
3Whether, FORM-2(B) Certificate of undertaking of Registered Structural Designer has been duly filled ?
4Whether, FORM-2(C) Certificate of undertaking of Registered Clerk of Works has been duly filled ?
5Whether, FORM-2(D) Certificate of undertaking for Hazard Safety (Regulation No. 18.4) requirement with information schedule, has been duly filled by Structural Designer ?
6Whether, FORM-11 Structural Inspection Report has been duly filled by Structural Designer in case of ADDITION/ALTERATION cases?
7Whether, the self attested passport size photographs has been submitted by Developer/Builder/Owner ?
 DOCUMENT / BONDS / AFFIDAVIT / UNDERTAKINGS
8(A)Whether The Application Is For Revised Case? (In Revise Case, Sr. No. 8(B),9(A),10,14,15,19,21,22,23,26,31,33,34,35,36,37 are not to be filled)
8(B)Whether the affidavit of appointment on Rs. 50 stamp paper for concerned Architect / Engineer / Structural Designer / Clerk of Works has been attached ?
9(A)Whether the bond for acceptance of responsibility by owners, builders, developers, engineers / architects, structural designers, Clerk of Works for the construction of High-rise building has been furnished ? (Bond on Rs. 100 stamp paper)
9(B)Whether the bond for appointment and acceptance for responsibility has been attached? (Compulsory in case of change in Architect / Engineer / Structural Designer / Clerk Of Works / Owner / Developer.)
10Whether the affidavit cum declaration for parking has been submitted ? (Bond on Rs. 60 stamp paper). Compulsory where parking is required as per GDCR
11Whether the building under permission contains more than 8 units ? If Yes,
11(A)whether undertaking for ownership of land has been transferred to registered society before taking bu permission(bond on rs 100 stamp paper). in case of revised case provide true copy.(not applicable for ownership of registered society)
12Whether the self attested photo copies of License Certificate of Engineer/Architect, Structural Designer, Clerk of Works has been furnished alongwith the application ?
13Whether the documents showing ownership and rights to develop the said land has been furnished ? (Documents : Original copy of property registered card / sanad, latest R.R. record in original (7/12) / Original copy of Tippan / Certified copy of Sale Deed. In case Of Revise case, provide true copy
14Whether the original copy of Part plan has been attached ?
15Whether the original copy of Zoning Certificate has been attached ?
16Whether 5 sets of Building Plan, Elevation, Section Plans has been furnished ?
17Whether 3 sets of drawings showing, Fire Fighting requirements for the Proposed Building has been furnished?
18Whether the proposed development is in the T.P. Scheme area or G.I.D.C area? if "NO" then
18(A)Whether the Layout plan / Site Plan showing F.P. / O.P. in scale of 1 : 400 has been submitted ?
18(B)Whether the Original Tippan in scale of 1 : 400 has been submitted ?
18(C)Whether the affidavit cum undertaking for Non T.P.Scheme area has been submitted?
19Whether the development of the proposed building has been demanded in sub-plot ? If "YES" than
19(A)Whether the certified copy of the approved layout plan / building plan / BU permission has been attached ?
20Whether, any permission has been previously availed ? If "YES", than
20(A)Whether such permission letter and approved layout plan and building plan has been attached ?
21Whether the soil investigation report (3 CD Copies and one hard Copy) has been furnished ?(as per GDCR Clause No. 5.1)
 OPINION and N.O.C.
22Whether the original copy of Municipal Property Tax Clearance Certificate (upto the current year) has been furnished ?
23In case of T.P. Scheme area, whether the original copy of betterment tax clearance certificate has been furnished ? (In G.I.D.C. area it is not applicable)
24Whether the TPI'S Opinion has been obtained ?
24(A)Whether the development asked is with coherence to TPI's opinion?
25Whether the proposed use of development is in confirmation to Col. 3 and/or Col. 6 of USE ZONE TABLE of GDCR Clause No. 32
25(A)Whether the proposed use of development is mix of residential and commercial or fully commercial type?
25(B)Whether the proposed development is in confirmation to GDCR Clause No. 12.1 ?
25(C)Whether approval from Municipal Commissioner has been received?
26Whether the proposed Development on the plot, where existing bulding is demolished or to be demolished? If "YES" than,
27Whether the certificate from Engineering Deptt., for disconnection of existing water / drainage has been furnished ?
 Conformity with other Acts & Regulations as per clause no. 4.2.1 of GDCR.
28Whether proposed Building line observe setbacks from the road-side, as prescribed in the Development Control Regulations or in T.P. Scheme Regulations, whichever is more? If "No", than
28(A)Whether NOC of concerned department has been furnished?.
29Whether the proposed building, if situated in the viscinity of oil-well installed by O.N.G.C., observes setbacks for the building line as prescribed by Indian Oil, Mines Regulation 1993? If "No", than.
29(A)Whether NOC of concerned department has been furnished?.
30Whether the proposed building, if situated in the viscinity of Grid-lines laid by A.E.Co./GEB, observes horizontal/vertical setbacks as prescribed under Indian Electricity Rules 1956 ? If "No", than.
30(A)Whether NOC of concerned authority has been furnished?.
31Whether the proposed building, if situated in the vicinity of railway boundary, observes setback for the building line as amended by the railway authorities ? If "No", than.
31(A)Whether NOC of concerned authority has been furnished?.
32Whether the height of the proposed building is within the maximum permissible height as opined by TPI?
32(A)Whether Airport NOC has been furnished ?. In case Of Revise case, provide true copy
32(B)Whether Airport NOC for Restricted/Critical Zone (as declared by Airport Authority) has been furnished ?. In case Of Revise case, provide true copy
33Whether the NOC as per Gujarat Smoke nuisance act, 1963 has been attached ?
34Whether the NOC as per Water (prevention and control of pollution) Act, 1974 has been attached ?
35Whether the NOC as per Air Pollution Control Act, 1981 has been attached ?
36Whether the proposed building, if situated in vicinity of Jail has made provisions as amended by the Jail Authority ? If "NO" , than.
36(A)Whether NOC of concerned authority has been furnished?.
37Whether the NOC from Telecommunication, ISRO, Archeology, Heritage Cell (AMC) and Conservation / Prevention of Monuments, has been attached ?
 VICINITY OF PROTECTED MONUMENT
38(A)Whether the proposed building lies more than 300 Mts. from radius of protected monument ? If "NO", than.
38(B)Whether the proposed building lies within the 100 Mts. radius of protected monument ? If yes, than.
38(B) (i)Whether the NOC of Archeological Survey of India has been furnished?.. In case Of Revise case, provide true copy
38 ?Whether the proposed building lies between 100 Mts. to 300 Mts. radius of the protected monument ? If yes, than
38? (i)kindly attach the NOC of concerned authority If "NO" than,. (In case Of Revise case, provide true copy)
38? (ii)If the proposed building is lowrise then as per circular, Whether necessary bond has been attached? ( In case Of Revise case, provide true copy
39Whether the distance of the proposed building from the existing water course nearby, controlled as per GDCR clause no. 14.
40In Conformity to GDCR clause no. 31, furnish an undertaking for provision of tree plantation at the rate of one tree for every 100 sq. Mts. of building unit.
 GENERAL
41In Conformity to GDCR clause no. 4.3(b), whether the 'change of use' for the proposed building has been demanded in the previous approved use? ( in case of Additional/ Alteration)
42In Conformity to GDCR clause no. 4.6, Whether the proposed building seeks Development permission in the land occupied by Graveyards, Kabrastans, Burial grounds, Crematoria etc ?
43Whether the proposed building seeks Development permission within the area of walled city, village or railwaypura, for educational institutions other than K.G., Primary, Secondary School or Higher Secondary School ?
44Whether the "Letter of Consent" of the Co-owners, if any, has been furnished ?
45Whether the proposed building is abutting on any of the overbridge or underbridge ?
46Whether the buiding unit / proposed building is under the litigation of any court matter ?
47Whether the proposed plans has been submitted as per the road proposal made in the development plan ?
48Whether the proposed use is permissible as per the road proposal made in the development plan ?
49Whether the proposed building is situated within 'The Gandhi Ashram Comprehensive Area Improvement Scheme' (GACAIS) ? If Yes, then
49(A)Whether the proposed plans for the building has been submitted as per GDCR clause no. 16.1.
50Whether the proposed building is situated within 'Sabarmati River Front Development Corporation' Scheme' (SRFDC) ? If Yes, then
50(A)Whether the proposed plans for the building has been submitted as per concerned dept?
51Whether the Color-Notes in the layout plan and building plans has been as per GDCR clause no. 3.4 ?
 In confirmation to GDCR clause no. 4.2.2, Site Information :
52(a) Whether the site is unhygienic ?
53(b) Whether the availability of water supply within a reasonable period of time, is feasible ?
54(c) Whether the site is dangerous for construction ?
55Whether the site is capable of providing proper drainage connection ?
56Whether the proposed site is located on any area filled up with carcasses, excreta, filthy and offensive matter ?
57Whether the USE of the said construction is proper/appropriate, from the health and the safety point of view for the inhabitants of the neighborhood ?
58Whether the owner of the building has taken enough measures to safeguard the construction from constantly getting damp ?
59Whether the level of site is lower than the datum level prescribed by the competent authority, depending on topography and drainage aspects ?
60Whether the proposed site, is to be used for cinema, theatre, assembly use, place of public worship, residential logging and boarding house ? If Yes, then
60(A)Whether the approval certificate / NOC of competent authority has been attached?. (Jilla Magistrate and Commissioner of Police)
61Whether the proposed site has a means of access from the authorized street, as described in regulations ?
62Whether the approach road to the site from the authorized street, is in accordance with the regulations ?
63Whether the proposed development is against Urban Aesthetic of Environment or Ecology or Historical Architectural building, Heritage Building or Not in Public Interest or ?
64Whether appropriate measure has been taken to prevent liquefaction of soil, under the earthquake intensity of the area ?
66Whether appropriate protection measures has been taken for the proposed site against storm surge, if prone to cyclone ?
 RELATED TO LAYOUTS
67Whether the proposed Layout plan has been furnished in appropriate scale, and measurements in accordance with Tippan / T.P. Scheme proposal ?
68Whether the area shown in the site plan is in accordance to that shown in the document & certificate attached ? [Certificates / documents includes RR (7/12 Utara), F-form, Form-4 for Amalgamation/Subdivision, Property Card, Approved Plans.
69Whether the key plan of the proposed Layout is in accordance with development plan/T.P.scheme ?
70Whether the direction "North" and "Scale reading" shown on the Layout plan ?
71With reference to road level, whether the general level of plot and other physical features such as tree, nala, ONGC wells / pipelines, electric grid lines, railway lines etc. has been shown in accordance with the actual site conditions ?
72Whether the provision for approach for the proposed building unit to abutt on the existing road or proposed road has been made as per GDCR clause no. 10.4, note-2.
73Whether the general level of the building unit, laid in accordance with the GDCR clause no. 10.3, with respect to the crown of the road, in front of the plot ?
74Whether the width of the internal roads, with respect to the length of the plot is in accordance with the regulation made in GDCR clause no. 10.4 ?
75As per GDCR clause no. 10.4, note-3, for a building unit if abutting on Govt. nalia road (where no T.P.scheme has been made), a minimum of 9 Mts. imaginary plot boundary shall be considered from the centre of the nalia road on both the sides of the nalia.
76Whether the proposed Development lie within the T.P.S. Area? If No, then
77Whether the proposed development is in accordance, as per GDCR clause no. 10.4, note-9 & 10,
78In Case of Building Unit 2000 sqmt or more, Whether the Common Plot is proposed as per GDCR Clause No. 10.6.1 , for Residencial and/or Commercial use ?
79(A)In confirmation to common plot as per GDCR clause no. 10.6.2 for Industrial use: Whether the plot area is between 5000sq.mt. to 20000 sq.mt.? If yes, then the area of common plot shall be proposed 8% of total plot area.
79(B)Whether the plot area is more then 20000 sq.mt.? If yes, then the area of common plot shall be proposed at the rate of 1600 sq.mt. plus 5% of the area of the plot.
80As per GDCR clause no. 10.6.3 other then Residential, Commercial and Industrial use: Whether the plot area is more then 2000 sq.mt.? If yes, then the area of common plot shall be proposed at the rate of 20% of the area of the plot.
81Whether Common Plot is Provided as Per GDCR 10.6(4) ?
82In the Case of mixed Development of High Rise and Low Rise, is computed FSI as per GDCR 10.7 ?
83As per GDCR clause no. 10.8, Length of Building: Whether the length of Building in case of flats, apartments and institutional buildings is more than 50 Mts. ? If yes, then passage of width 7.5 Mts. and clear ht. 6 Mts. shall be proposed at every 30 Mts.(The length of building shall not be more than 150.00 Mt. in any case
84In Conformity to GDCR clause no. 10.9, whether the area of proposed building unit exceeds 1500 sq. Mts. and upto 4000 sq. Mts. ? If yes, provide percolating well in the said building unit as per GDCR.
85Whether the area of proposed building unit exceeds 4000 sq. Mts. ? If yes, providing one percolating well in the said building unit for every 4000 sq. Mts. or part there of area of building unit as per GDCR.
86As per GDCR clause no. 10.11, Whether the drainage facilities is available to the land to be developed? If "No" than
86(A)Whether Septic tank/ Soak pit/ Soak Well is shown in drainage plan?
86(B)Whether a safety certificate from licensed Structural Engineer, for the location of Soak-pit has been furnished as per GDCR Clause No. 10.11?
86?Whether the design and location criteria by considering local condition shall be in comformity with the GDCR Clause No. 10.11?
 IN Conformity TO PARKING LAYOUT:
87(a) For residence, the permissible F.S.I. is 1.8 Whether the provision for parking at a rate of 15% of maximum permissible F.S. I. has been made?
88(b) For Commercial, the permissible F.S.I. is 1.8 Whether the provision for parking at a rate of 30% of maximum permissible F.S. I. has been made? (As per GDCR clause no. 19.1)
85(A)For mix use, whether the provision for parking, proportionately as per use has been made as per GDCR clause no. 19.1?
89(c) For other purposes,Whether the parking area is in accordance to GDCR clause no. 19.1?
90Whether the parking provisions for cars and visitor's parking in accordance to GDCR clause no 19.1?
91For plots abutting on 9.0 Mts. or more width road, Whether provision for parking has been made as Commercial Standards?(for ground floor built-up area without hollow plinth) as per GDCR clause 19.1 , Note - 1.
92Whether provision for visitor's parking has been made only on Ground Level as per GDCR clause no. 19.1 note-7?
93For the Car Parking Area capacity exceeding 300sq. Mts., Whether two accesses of 3.0 Mts. each or one access of 6.0 Mts. has been proposed as per GDCR clause no. 19.2 note -2?
94Whether parking provision is made in the Cellar?
95(a) Whether the gradient of ramp leading to parking space is proposed with slope not more than 1:7 as per GDCR clause no 19.2 note-3?
96(b) Whether the clear Headway of 2.4 Mts. is made at every accesses leading to parking space as per GDCR clause 19.2 note-4?
97Whether the provision for parking proposed in the common plot for residential purpose is Not more than 50% of common plot area?
98Whether parking has been proposed in the marginal space of 3.0 Mts.?If Yes, then
98(A)Whether proposed parking in marginal space is violating any provision made in GDCR clause no. 19.2 ?
 IN Conformity TO BUILDING PLANS :
99Whether the proposed use on the said plot which abuts on the wide road, is permissible as per GDCR clause no. 12.1(a) ? (High-rise building, cinema hall, meeting / community / lecture / town hall / auditorium / petrol pump / head and regional / public / establishments, starred hotels, college, technical institution, general hospital, poly clinic are permissible on 18.0 Mts. and above roads)
100(a) Whether the use for commercial development has been shown only on ground floor for the proposed plot if abutting on the road having width more than 9 Mts. and less than 12 Mts. as per GDCR clause no. 12.1(b) ?
101(b) Whether the use for commercial development has been shown only on ground floor and first floor for the proposed plot if abutting on the road having width more than 12 Mts. and less than 18 Mts. as per GDCR clause no. 12.1(b) ?
102(c) Whether the use for commercial development has been shown on all floors of the proposed plot if abutting on the road having width more than18 Mts. as per GDCR clause no. 12.1(b) ?
103Whether the proposed use on the building unit is permissible as per GDCR clause no. 12.2 ? Use : Minimum area of building unit High-rise 1500 sq.mts. Primary and High School building 1000 sq. Mts. Education institute, all types of hall 2000 sq. Mts.
104Whether the maximum permissible FSI and Maximam Built-up Area of the proposed development is in accordance with GDCR Clause No. 12.3.1?
105Whether the proposed development is for Non- Industrial Use ?
106For Non-Industrial Use, Whether the road side margin of the proposed building is in accordance to GDCR Clause No. 12.4.1(A)(i) ?
107For Non-Industrial Use, Whether the margin other the road-side for the proposed building unit is in accordance to GDCR clause no. 12.4.1(A)(ii).
108For Non-Industrial Use, Whether the built-up area of proposed building is in accordance GDCR clause no. 12.4.1(A)(ii)?
109Whether the the margin of minimum 4.5 Mts. from the common plot for the high-rise building has been shown in the layout as per GDCR clause no. 12.4.1(F) ?
110(1) Whether the minimum road side margin (0.3 H or 6.0 Mts. whichever is more) has been proposed as per GDCR Clause No. 12.4.1.(A) (iv) ?
111(2) On the remaining sides, whether the margin (0.2 H or 6.0 Mts. whichever is more) has been proposed as per GDCR Clause No. 12.4.1.(A) (iv)?
112(3) Whether the margin between two buildings has been proposed as two times the margins required on the remaining sides as mentioned above ?
113In Conformity to GDCR clause no. 12.4.1.(B), for Industrial Use, Whether the Built-up area, on any floor of the proposed building exceeds 50% of plot area?
114For Industrial Use, Whether the road side margin and other then road-side margins for the proposed building is in accordance to the GDCR clause no.12.4.1.(B)?
115For Industrial Use, Whether the distance between two detached structures in the same plot is in accordance GDCR Clause no. 12.4.1. (B) (i) ?
116Whether the proposed Security Cabin is in accordance to GDCR Clause No. 12.4.1.(D) ?
117Whether the underground water tank or surface water tank upto 1.5 Mts. in height from ground level and a tubewell, pump room with maximum size of 1.5 Mts. x 1.5 Mts. and upto height of 1.8 Mts. has been shown in the layout (permitted in the marginal sides other than the road side margin) as per GDCR clause no. 12.4.1(D) ?
118Whether the weather shed has been proposed upto 0.6 Mts. at a height of 2.0 Mts. from the floor level, but not in continuation with the floors slab as per GDCR clause no. 12.4.1(E)(i) ?
 (B) PERTAINING TO OPEN SPACE
119Whether the height of the building and the width of the open space proposed is in accordance to GDCR clause no. 12.5.1?
120In case of water-closet, bathroom and sanitary blocks, whether an opening of minimum 0.25 sq. Mts. on atleast one of the walls, upon a minimum of 0.9 Mts. wide space or upon a verandah not less than 1.5 Mts. wide opening to air on one side, has been proposed in accordance to GDCR clause no. 12.5.2?
121Whether an open space, to be kept open to sky has been proposed in accordance to GDCR clause no. 12.5.3?
 FOR LIFTS:
122Whether the provision for Lifts has been made in accordance to GDCR clause no. 17.1?
123Whether the lift has been proposed at the rate of one lift for 20 tenements of all the floors, or part thereof for Residential buildings excluding ground floor and two upper floor?
124Whether the lift has been proposed at the rate of one lift per 1000 sq. Mts., or part thereof of built-up area for Non-Residential buildings?(Exclude built-up area on Ground Floor and two Upper Floors, in computing the above requirement)
125Whether a minimum of two lifts have been proposed for the building, if having a proposed height of 21 Mts. or more?
126Whether the Lift has been proposed from the Ground Floor and having a minimum capacity of 6 persons; in accordance to provisions made in National Building Code?
127Whether the lift has been proposed within accessible distance of not more than 25 mt. From any entrance of tenament/ office on each floor.
128Whether, at least one lift, has been designed as fire-lift in accordance to National Building Code and installation and other provisions made in accordance with GDCR clause no. 17.1?
129Whether the proposed building, has made a provision for staircase with both sides totally open to external open air space? If No, whether at least one staircase has been proposed as a fire- staircase?
130Whether an Underground Tank having a capacity of 1 lakh litres has been proposed?
131Whether the provision for installation of Internal Fire Hydrant has been made, in accordance to National Building Code or as per IS codes?
132Whether the provision for installation of External Fire Hydrant, alongwith connection to Municipal Water Mains not less than 4" diameter and connection to Booster Pump from the static supply has been made for ?
133Whether a provision for separate electric supply has been made for the Internal Fire Hydrant System?
134Whether the provision for Diesel Generator has been made for the Building, if having a height more than 25 Mts.?
135Whether the provision for Staircase and Alarm System has been made(as per the National Building Code)for Fire Protection System?
136Whether the provision for dry-powder, and two fire-extinguisher on each floor with a capacity of 5 kgs. has been made for?
 SAFETY OF BUILDING :
137Whether all the external walls of the proposed building has been proposed as per GDCR clause no. 17.3(1) ?
139Whether a minimum thickness of 23 cms. for the external walls of cellar (in case of RCC wall) or a thickness of 45 cms. in case of brick walls has been shown in the layout as per GDCR clause no. 17.3(2) ?
 PLINTH : (In accordance to GDCR clause no. 17.4)
140Whether a minimum plinth height of 0.45 Mts. for the habitable rooms has been proposed ?
141In case of hollow plinth, whether the minimum clear height of 2.4 Mts. (exclusive of beams and slab) or maximum height of 2.8 Mts. (inclusive of slab with beam) has been proposed ?
142Whether a maximum built up area of 15 sq. Mts. has been proposed with a minimum plinth of 30 cms., for Electric meter room, Telephone DB room, Bath room, Water room, Stair-case room, Pump room, Water Closet, Servant room, Security Cabin ? (This area s
 CELLAR : (In accordance to GDCR clause no. 17.5)
143Whether Cellar is proposed ?
144The total area of the cellar shall not exceed two times the plinth area of the building or the area of the plot whichever is less. Whether the provision for cellar area has been computed as above and shown in the layout ?
145The cellar is not permissible in the minimum marginal space. Whether this has been taken care of in the layout plan ?
146Whether the minimum clear height of 2.4 Mts. for the cellar from the top of the flooring to the bottom of the lowest structural member has been shown ?
147Whether the maximum depth of basement as 2.5 Mts. below ground level has been shown ?
148Whether the clear width of the stair leading to the cellar as same/more than the width of the regular stair case leading to upper floors, has been shown ?
149Whether the proposed staircase in the cellar made of any wooden material ? (Staircase in the celler is not allowed if it is madeby wooden material)
150Whether the provision for adequate opening for ventilation has been proposed in the cellar ?
151Whether the water connection or drainage connection has been shown ?
152Whether the use of the cellar is for parking , AC Plant or Safe Deposit Vault or Store ?
153Whether the second cellar has been shown ?
153(A)If yes, whether the parking space available at ground floor and in first cellar as not sufficient is stated in writing to the competent authority ?
 HEIGHT OF FLOORS :
154Whether the minimum height of 2.8 Mts. for floors in proposed residential buildings or commercial buildings has been shown as per GDCR clause no. 17.6 ?
155In case of offices for ancillary uses of factories, workshops, godowns and other industrial purposes, Whether a minimum height of 3.0 Mts. or as per Factory Act/other relevant Act has been proposed ?
156Whether a minimum height of 2.0 Mts. has been proposed for verandah, bathroom, W.C., passages, puja room, store room, stair cabin ?
157Whether a minimum height of 3.0 Mts. has been proposed from the lowest point of the fold in case of folded roof?
158Whether a minimum height 2.2 Mts. below the lowest part of the roof, in case of gabled or sloping roof, has been shown?
159Whether an average height of the room works out to be a minimum of 2.8 Mts., in the above case?
160Whether the minimum height of the floor shown in the layout has been computed from the pavement to the bottom of the tie beam, in case of trussed roof?
161Whether loft at a minimum height of 2.0 Mts., not having the area exceeding 30% of floor area of room has been proposed as per GDCR clause no. 17.7?
162Whether the width of the corridor is in accordance to GDCR clause no. 17.8(a)?
 STAIRS: (As per GDCR clause no. 17.8 & 17.12)
163Whether the proposed width of stairs is in accordance with the proposed building use as per GDCR Clause No. 17.8 ?
164Whether the no. of riser shown in the single flight is less than 12?
165Whether the tread and riser has been proposed in accordance to National Building Code?
166For the purpose of proposed Use, Whether the size of tread shown in the layout is in accordance with the regulations ?
167Whether a minimum stair width of 1.5 Mts. has been proposed, in the case of more than 6 tenements on each floor ?
168Whether the stair-case has been proposed within accessible distance of not more than 25 Mts. from any entrance of tenement/office on each floor?
169Whether the Stairway has been proposed as per GDCR clause no. 17.12?
 SANITARY ACCOMMODATION:
 (As per GDCR clause no. 17.9)
 (a) Office/Public Building:
170Whether the sanitary accomodation is proposed as per GDCR Clause No. 17.9 (A)?
 (b) Industries/Warehouses:
171Whether the sanitary accomodation is proposed as per GDCR Clause No. 17.9 (B)?
 (c) Educational Buildings:
172Whether the sanitary accomodation is proposed as per GDCR Clause No. 17.9 (C)?
173Whether a provision for atleast one water-closet has been made in case of Residential Buildings?
 VENTILATION: (As per GDCR clause no. 17.10) :
174Whether a provision for ventilation (doors, windows, and ventilators) having aggregate opening not less than 1/7th of the floor area, abutting on open air spaces having an opening of not less than 1/10th of the floor area of the room, has been made?
175Whether a provision for ventilation (windows, ventilators, sky lights, exclusive of doors) having clear opening not less than 1/7th of the floor area, abutting on open air space of width not less than 1/3rd of the height of the part of the building abutting such open space has been made?
176Whether the provision for Ventilation in Staircase has been made as per regulations?
177Whether the provision for Ramp has been made as per GDCR clause no. 17.13?
178Whether the provision for Drainage-Rain Water Pipe has been made as per GDCR clause no. 17.14?
179Whether the provision for height of Parapet walls and Handrails(minimum of 1.15 Mts. from the finished floor level and maximum of 1.3 Mts. above the unfinished floor level)has been made as per GDCR clause no. 17.16? In case of sloping roof area, it is not applicable
180Whether the provision for stair-case has been made for the water tank having a height more than 1.5 Mts., as per GDCR clause no. 17.17?
 COMPOUND WALLS AND GATES:
181Whether the provision for Compound Walls and Gates has been made, as per GDCR clause no. 13?