Daily water supply: 108 mgd (490 mld)

Sources

French Wells      : 32 mgd (145 mld)
Infil. Wells (16)    : 18 mgd (82 mld)
Tube Wells (315): 58 mgd (263 mld)
Per Capita Supply     :  31 gallons (140 ltrs.)
Distribution Stations :   65

W52waterproj.jpg (11340 bytes)


Project Proposal
To serve 35% unserved areas in the extended limits
To augment water supply in the critical areas all over the city
To channelize the direct supply of bore water through underground tanks duly chlorinated

City Water Supply Project - Major Components

(1996-2000) Rs. in Millions

No.

Components

Cost Date of Completion
1 Frenchwells (2) 160.00  March 2000
2 New Water Distribution Stations (16) 310.60  December 1999
3 Additional U.G. Tanks at the existing stations (17) 62.60  June 1999
4 Water distribution Network (300 Kms) 516.00  December 1999
5 Bore Wells (60)   120.00  March 2000
6 Repairs of over head tanks (18) 27.00  December 1999
7 Leak detection 60.00  2001
8 Water supply from Narmada Main Canal to Kotarpur 100.80  Decision pending with GOG
9 Narmada Canal/Linkages work transmission mains 593.20  Decision pending with GOG
10 Shifting of Trunk main at Airport 25.20  Completed
Total 1975.4