Project cost: Rs.100 Millions
   
Project period:  2 years

Solid Waste Management

Introducing concept of handle waste once only
All open temporary garbage storage sites to be eliminated and replaced by containerized system
Community based primary collection system to cover all households, shops and establishments to ensure zero garbage on the road
All slums to be covered under the new system
Bio-organic fertilizer (soil enriched) to be produced from waste as a mode of final disposal of waste
All hospitals, nursing homes waste to be incinerated/ disinfected before disposal
Waste Generation
1200 tons waste is generated per day
The garbage is removed on the same day
The garbage is disposed off at the landfill site at Pirana
Hospital waste is being incinerated
Collection
AMC has employed more than 6500 sweepers to cover an area of 190.84 sq. kms.

The AMC has recently increased its temporary waste storage pits from 462 to 708

Open waste storage sites are being phased out and replaced by large garbage containers (4.5 to 10 M size).

Solid Waste Management

Community Based Primary Collection System
Segregation of recyclable waste at source.
One community bin per 15-20 household for storage of organic waste.
Waste from such 80 to 100 bins to be cleared by a tricycle and taken to the nearest collection point by a contractor.
Tricycle are also used for collection of waste from Safai Kamdar in their beats and taken to large bins.
One tricycle covers 10 beats. 1200 tricycle are being contracted.
Special emphasis is put on covering the 41% of City population living in slums.
Community Participation
Pilot project of source segregation of recyclable and organic waste was implemented in 131 pockets in Ambawadi area with the support of Clean Ahmedabad Abhiyan taken up by Prathana Construction, SBI Staff Association & SEWA (N.G.O.).
SEWA organized women ragpickers to collect the segregated waste.
AMC has arranged to collect organic waste from the community bins on day to day basis.
SEWA has trained 4000 ragpickers to collect waste from the housing societies.
Transportation

Ahmedabad is one of the first cities in India having a full mechanized system of transporting solid waste.

No manual loading of waste.

126 Vehicles and machinery's are deployed for transportation.

DISPOSAL OF WASTE
- Mostly the Municipal waste is disposed of at the landfill / site at Pirana.

W46solidwaste.jpg (13276 bytes)
W45solidwaste.jpg (9099 bytes)

Ahmedabad Municipal Corporation
Solid Waste Management
No. of sweepers engaged in collection, transportation and disposal of waste and annual expenditure of same.
  Total no of Sweepers

Annual expenditure Rs. Millions

Collection 6827 251.4
Transportation and Disposal 531 52.6

Total

7358 304.0
Ahmedabad Municipal Corporation
Solid Waste Management

Details of expenditure incurred by the Ahmedabad Municipal corporation after the solid Waste Management during the last 5 years.

Rs. in Millions

Description 1992-93 1993-94 1994-95 1995-96 1996-97
Revenue Account
Establishment, Equipment and Maintenance 164.8 188.8 222.4 273.4 304.0
Capital Account
Vehicles & Machinery 4.1 4.8 2.7 13.6 15.2
Equipments 0.4 0.7 2.8 3.2 2.2
Total 168.4 194.3 227.9 290.2 321.4

Ahmedabad Municipal Corporation
Solid Waste Management
Equipment and vehicles deployed on day to day basis for the transportation of waste from the communal waste storage sites.
(JULY - 1997)
Total No of Vehicles deployed - 129
Total waste disposal - per day - 1277 Tones.
S.R. No. Name of vehicles No.of Vehicles exiting First Second Third Total Disposal of Waste Tones. Note
1 JCB Machines 13 5 5 - 10 674
-
2 Tipper Trucks 93 20 20 - 40 - Open sites
3 Front and loader 10 3 2 - 5 110 Waste removed
4 Tipper Trucks 93 6 4 - 10 -
-
5 10m3 Roll on Roll off Machines - 16 9 5 22 296 Hydraulic vehicles for
6 4.5 m3 Dumper placer unit - 10 strong>10 - 20 176 lifting the container
7 Refuse collector 4 2 2 - 4 16 Closed body
8 Compactor Machine 2 1 - - 1 -5 vehicles
9 Mobile Collection
Refuse Rickshow 11 9 - - 9 - Mobile collection

Tata

2 2 - - 2 - Vehicles to be emptied in
Community Bin van 3 2 1 - 3 - 10 c.m.t. contains
10 Wheel dozer 3 1 1 - 2 - Leveling and
11 Bull dozer 3 1 - - 1 - Compacting the waste

Total

-

71

53

5

129

1277

-