The city of Ahmedabad is the 7th largest city of the country and the premier
city of Gujarat having population of 35 lacs and area of 198 Sq.Km.Ahmedabad
is basically industrial city having a large no of people living in slum Area.
As per 2001 data the city has slums situated at 1029 location and chawls at 1383
locations. Over 11.25 lacs people live in the slums and chawls. |
| Problem of Open Defication |
|
The city has been facing
a serious problem of open deification for want of adequate toilet facility
in slums and chawls . This is creating serious of health and sanitation
in the city. |
|
Status of Public Toilets
|
|
The city has more then 17000
community latrines and they are uncanned . The condition of this toilet
is pathetic . In adequate water facility, public apathy towards the use
of such facility etc. have made such toilet non-usable . At any point
of time 60 to 70 % of such toilets are found non-found for one more or
other reason. |
|
Need of Individual toilet and Pay & Use Toilet Facilities |
| ( A ) Individual |
|
The experience of past has shown the
unmanned public toilet are becoming nuisance. The corporation has therefore
decided to support the construction of individual latrine in slums where
ever it is possible by highly subsidized the cost of construction of such
toilet. Low cost sanitation scheme has been introduced to achieve this
objective. |
| Low Cost Sanitation Scheme |
|
The Municipal corporation has introduced a law cost sanitation
scheme where as slum dwelling unit was until recently was being
giving subsidy of 80 % of cost of construction
and under this scheme corporation gave subsidy Rs. 2483/- per
unit to the slum dwellers who come forward to construction a toilet as per design
given by the corporation. |
|
More than 27000 such latrine
has been constructed under this scheme with the support of the
World Bank credit under the World Bank 1643 in. |
| The corporation has further
decided to increase the pace of construction of the individual toilet
by increasing the subsidy from 80 % to 90 % effective from 1st April ,
1996 . The scheme is popular among the slum dwellers.
|
There are large no of slums that
which are congested having very little space between two raws of the dwelling
units . It is therefore found impossible to construct individual latrine
in such slums . The low cost scheme also dose not allow construction of
individual toilet on the street id the distance between two raws of slums
is less then 7th |
|
|
The pay and use toilet facility need
a regular maintenance round the clock basis . The corporation is therefore
promoting N G O s to take up the work of maintenance and construction
of the pay and use toilet and charge the fees prescribed by the corporation
for the use of toilet facilities. NGOs like NASA ,SULABH, AKHIL
BHARTIYA PARIYAVARAN SANSTHAN etc. have come forward to take up the work
of construction and maintenance of pay and use toilet facility. They are
ever ready to construct this as per the specification approved by the
corporation. |
|
Identification of Location
|
|
The city has 43 Municipal Election wards divided in to five
administrative zones namely East zone, West zone , South Zone ,
North zone , and Central zone. Slums are situated in all the ward
in varying degree. |
| The corporation has identified
areas and location where pay and use toilets are to be construction to
upgrade the sanitation in the slum. In the 2nd phase of the project, the
corporation has identified 61 location for the construction of pay and
use toilet facility. |
| In the 2nd phase to construct
the pay and use toilets, the corporation proposes to construct 733 Toilet
seat , 319 Urinal, 255 Bath at total estimated is Rs. 410.69 lacs . The
no of beneficiaries are expected to be 35400 who would be using the toilet
facility breakup as under. |
|
Zone
|
No. of Beneficiaries
|
|
East
Zone
|
5650
|
|
West
Zone
|
10300
|
|
North
Zone
|
4850
|
|
South
Zone
|
2950
|
|
Central
Zone
|
11650
|
|
Total
|
35400
|
| The
Municipal corporation desires to take loan from HUDCO for creating the
urban infrastructure in the terms of circular no UIFW / HUDCO / ROs- MZO
/ 94 dated 22nd March 1995 and requests HUDCO to extend loan @ 90 % of
the cost of construction @ 10.5 % rate of interest with a repayment period
of 12 years . The Corporation would also like to avail of 0.5 % interest
rebate on timely repayment . |
| All the toilets that would
be constructed will be water Flush latrine connected to under ground sewerage
system. All the toilet would be for the use of the slum dwellers . The
corporation would pay the installment on time and give security in from
of Gujarat Government Guarantee repayment of loan to HUDCO . |
| Subsidy |
| The HUDCO may kindly consider
granting necessary subsidy to the corporation for the constructing pay
and use toilet facility to the slum dwellers as is permissible in this
scheme. |
| Project cost
: Rs.100 Millions |
| Project period
: 2 years |
|
Year
|
Amount
(Rs. Millions)
|
|
1997-1998
|
50
|
|
1998-1999
|
50
|
|
Total
|
100
|
| 50 % matching grant
will be given by the Govt. of Gujarat. |
|