Coverage
with underground network till date:
|
|
Old city limits: 98.84 Sq.kms.
- 100 %
East Ahmedabad areas:
92.00 sq.km - 40 %
Existing sewerage network:
1200 kms
Total discharge of
sewage: 102 mgd (160 mld)
|
|
|
Coverage
with Underground Network - Till Date
|
|
Old City Limits
East Abad Areas
Existing Sewerage Network Total
Discharge of Sewage
|
:
98.84 Sq.K.M.-100%
: 92.00 Sq.K.M.-40%
: 1200 Kms.
: 102 MGD (460mld) |
| A large number of households
and establishments in east Ahmedabad are discharging waste water into
cesspools that have lost their absorption power. The waste water comprising
of sewage and sullage keeps on overflowing on the streets creating serious
incinerate condition posing a serious threat to health and environment.
There are about 25,000 cesspools which are presently being served by 50
cesspool cleaning tankers. These cesspools are required to be replaced
by laying underground drainage lines. |
|
AMC
Sewerage projects
The City is served with,
Underground sewer lines
1200 Km.
33 sewage pumping stations
4 sewage treatment plants Total
Sewage Handled- 90 MGD (408 MLD)
|
|
|
East
Ahmedabad Sewage Project<>b>
|
|
The city area was 98.00
sq.Km.in 1986.
|
| In the February 1986 external
area (East) 92 sq. Km. was merged. |
| In Old City limit 100 %
area was covered with underground sewerage system. |
| East
Ahmedabad Sewerage Project: Phase I |
|
25 sq.Km.of the new East
Ahmedabad (27% of new area) was covered with new underground sewerage
network of 91 Km. length pipeline and 9 S.P. Stations.
|
|
East
Ahmedabad Sewerage Project Phase II (1999-2001)
|
| 19 sq.km.is proposed to
be covered (24% of new area) with underground sewerage network of 100
km.length pipe line and 6 new S.P.Stations and one sewage treatment plant. |
|
|
Project
Proposals:
|
Construction of 6 interstate
pumping station (by 2001)
Estimated cost: Rs. 90 Millions |
Laying of secondary sewers
in 19 sq.km. Of residential area.(by 2001)
Estimated cost: Rs.190 Millions |
Procuring & installing
2 pump sets for the terminal sewage pumping station at pirana for east Ahmedabad
flow (by 2001)
Estimated cost: Rs.30 Millions |
| Tender premium 10% Rs.31 Millions |
| Escalation price 10% Rs.68
Millions |
| Admn.& Consl.charges Rs.41
Millions |
|
Total
projected cost: Rs. 450 Millions
|
|